Route 631 Corridor Study: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
No edit summary
(Redirected page to 5th Street Corridor Study)
Tag: New redirect
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The '''Route 631 Corridor Study''' is an on-going investigation by the [[Virginia Department of Transportation]] to study long-term needs of the road known as [[Old Lynchburg Road]] and [[Fifth Street Extended]]. The scope is between Harris Street in Charlottesville and Ambrose Commons in Albemarle County.
#REDIRECT [[5th Street Corridor Study]]
 
VDOT has hired [[Kittleson & Associates]] to work on the project.
 
The first phase concluded in August 2019.
 
The second phase began in September 2019.
 
Preliminary results were shown to the [[Fifth and Avon Community Advisory Committee]] at their meeting on [[February 20]], [[2020]]. <ref>{{cite-progress|title=Fifth Street corridor study reveals poor traffic conditions|url=https://www.dailyprogress.com/news/local/fifth-street-corridor-study-reveals-poor-traffic-conditions/article_ac3b4962-04d6-5d18-81f3-f5b43347e90b.html|author=Allison Wrabel|pageno=A1|printdate=February 22, 2020|publishdate=February 21, 2020|accessdate=February 25, 2020}}</ref>
 
{{stub}}
 
==Resources==
*[https://cvillepedia.org/images/21605.507_meeting2_minutes_FINAL.pdf Minutes from July 31, 2019 stakeholder group]
 
 
==References==
{{reflist}}
 
==External Links==
<!--Use this line if there are links that are not references e.g. *[http://www... official site]-->

Latest revision as of 10:44, 8 April 2020