Route 29/250 Bypass interchange improvements: Difference between revisions
Jump to navigation
Jump to search
(+created) |
m (+status) |
||
Line 12: | Line 12: | ||
<!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | <!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | ||
| purpose = Reconstruction with added capacity | | purpose = Reconstruction with added capacity | ||
| status-desc = | | status-desc = planning stages | ||
| website = | | website = | ||
| vdot-dashboard = | | vdot-dashboard = |
Revision as of 14:09, 19 October 2009
Route 29/250 Bypass interchange improvements | ||
---|---|---|
Proposed
|
||
Project Overview
|
| |
Reconstruction with added capacity
|
||
Location | Charlottesville | |
Sponsor | Charlottesville | |
Status Update
|
| |
planning stages |
This article is a stub. You can help cvillepedia by expanding it. |
The City of Charlottesville and the Virginia Department of Transporation are currently planning on a series of improvements to improve the capacity of the intersection of U.S. 29 and U.S. 250. Some of these plans are based on the 29H250 study.
In summary, the plans call for additional lane on the ramp leading from U.S. 29 onto the westbound U.S. 250 bypass. This second lane will be extended all the way to the Barracks Road exit.