List of transportation projects: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
Line 3: Line 3:


== Proposed new roads ==
== Proposed new roads ==
*[[Eastern Avenue (Crozet)]]: Called for in the [[Crozet Master Plan]]
*[[Eastern Avenue (Crozet)]]: Called for in the [[Crozet Master Plan]]
*[[Lickinghole Creek Bridge]] Called for in the [[Crozet Master Plan]]
*[[Lickinghole Creek Bridge]] Called for in the [[Crozet Master Plan]]
Line 11: Line 12:
== Road Improvements ==
== Road Improvements ==
===Completed===
===Completed===
*[[U.S. 29|Grade separated interchanges on Route 29]]: Part of [[Route 29 Solutions]] package. Construction in 2016.  
*[[U.S. 29|Grade separated interchanges on Route 29]]: Part of [[Route 29 Solutions]] package. Construction in 2016.  
*[[29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center]]
*[[29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center]]
Line 24: Line 26:
*[[Berkmar Drive Extended]]: Part of [[Route 29 Solutions]] package
*[[Berkmar Drive Extended]]: Part of [[Route 29 Solutions]] package
*[[Hillsdale Drive Extension]]: Part of [[Route 29 Solutions]] package, administered by City of [[Charlottesville]]
*[[Hillsdale Drive Extension]]: Part of [[Route 29 Solutions]] package, administered by City of [[Charlottesville]]
===Under construction===
===Under construction===
*Extension of Lewis and Clark Drive from [[UVA Research Park]] to Airport Road, paid for by [[UVA Foundation]] <ref>{{cite web|title=UVA Foundation Breaks Ground on Lewis and Clark Extension|url=https://www.nbc29.com/story/41107208/uva-foundation-breaks-ground-on-lewis-and-clark-extension|author=CJ Paschall|work=News Article|publisher=NBC29|location=|publishdate=September 26, 2019|accessdate=September 29, 2019}}</ref>  
*Extension of Lewis and Clark Drive from [[UVA Research Park]] to Airport Road, paid for by [[UVA Foundation]] <ref>{{cite web|title=UVA Foundation Breaks Ground on Lewis and Clark Extension|url=https://www.nbc29.com/story/41107208/uva-foundation-breaks-ground-on-lewis-and-clark-extension|author=CJ Paschall|work=News Article|publisher=NBC29|location=|publishdate=September 26, 2019|accessdate=September 29, 2019}}</ref>  




===Planning stages===
===Planning stages===
*[[Virginia_State_Route_240#Bridge_replacement_planned|Replacement of Route 240 bridge over Lickinghole Creek]]
*[[Virginia_State_Route_240#Bridge_replacement_planned|Replacement of Route 240 bridge over Lickinghole Creek]]
*[[Route 240 / 250 Roundabout]]
*[[Route 240 / 250 Roundabout]]
Line 39: Line 44:


==Corridor studies==
==Corridor studies==
*[[Avon_Street#Corridor_study|Avon Street Extended Study]]<ref name="CY19-2Q">{{cite web|title=Capital Projects Status Report - 2nd Quarter CY2019|url=https://albemarle.legistar.com/View.ashx?M=F&ID=7563836&GUID=DD898157-9234-4EEB-96CE-07CE2A94105E|author=Status Report|work=|publisher=Facilities & Environmental Services Department Facilities Planning & Construction Division|location=|publishdate=August 7, 2019|accessdate=August 16, 2019}}</ref>  
*[[Avon_Street#Corridor_study|Avon Street Extended Study]]<ref name="CY19-2Q">{{cite web|title=Capital Projects Status Report - 2nd Quarter CY2019|url=https://albemarle.legistar.com/View.ashx?M=F&ID=7563836&GUID=DD898157-9234-4EEB-96CE-07CE2A94105E|author=Status Report|work=|publisher=Facilities & Environmental Services Department Facilities Planning & Construction Division|location=|publishdate=August 7, 2019|accessdate=August 16, 2019}}</ref>  
*[[East Rio Road Corridor Study]] ''(requested by Albemarle Planning Commission, not yet commissioned)''
*[[East Rio Road Corridor Study]] ''(requested by Albemarle Planning Commission, not yet commissioned)''
Line 44: Line 50:


===In Design===
===In Design===
*[[Belmont Bridge Replacement]]: City reviewing request for proposals  
*[[Belmont Bridge Replacement]]: City reviewing request for proposals  
*[[West Main Streetscape]]: Still in design
*[[West Main Streetscape]]: Still in design
Line 52: Line 59:


===Conceptual stage===
===Conceptual stage===
*[[Paving Rural Roads]]
*[[Paving Rural Roads]]
*[[Rt. 53 Buck Island Creek Bridge Replacement]]
*[[Rt. 53 Buck Island Creek Bridge Replacement]]
Line 60: Line 68:


== Trails and train infrastructure ==  
== Trails and train infrastructure ==  
*[[Northtown Commuter Trail]]
*[[Northtown Commuter Trail]]


===Completed===
===Completed===
*[[McIntire Park pedestrian bridge]]
*[[McIntire Park pedestrian bridge]]


===Planned===
===Planned===
*[[Rivanna Greenway Trail]]
*[[Rivanna Greenway Trail]]
*[[Rivanna North Greenway Trail]]
*[[Rivanna North Greenway Trail]]
Line 71: Line 82:
== Transit Projects ==
== Transit Projects ==
===Completed===
===Completed===
*[[Downtown Transit Center and Plaza]]
*[[Downtown Transit Center and Plaza]]


===Conceptual===
===Conceptual===
*[[Virginia Railway Express]]
*[[Virginia Railway Express]]
*[[Regional Transportation Authority]]
*[[Regional Transportation Authority]]
Line 90: Line 103:
| [[Ivy Road Sidewalks]] || Sidewalks along Ivy Road from the existing sidewalk at the Charlottesville City
| [[Ivy Road Sidewalks]] || Sidewalks along Ivy Road from the existing sidewalk at the Charlottesville City
limits to Stillfried Lane with a potential future extension along the University of Virginia property to
limits to Stillfried Lane with a potential future extension along the University of Virginia property to
the Route 29/250 Bypass interchange. || Proceeding to bid||  
 
the Route 29/250 Bypass interchange.  
| Proceeding to bid||  
  || [[Albemarle County]]
  || [[Albemarle County]]
|-  
|-  
| [[Rio Road / Avon Street and Rt. 250 Rockfish Gap Pike Sidewalks]] || See page for details || Proceeding to bid||  
| [[Rio Road / Avon Street and Rt. 250 Rockfish Gap Pike Sidewalks]] || See page for details || Proceeding to bid||  
  || [[Albemarle County]]
  || [[Albemarle County]]
|-
|Berkmar Bicycle and Pedestrian Improvements
|This project will support pedestrian and bicyclist safety by constructing an approximately 1.1 mile-long shared-use Path from the Berkmar Drive/Rio Road West intersection to Hilton Heights Road and connect to the shared use path extending northward from the Berkmar Drive-Hilton Heights Road roundabout.
|Design
|30 percent design
|[[Albemarle County]]
|}
|}


==Projects on hold==
==Projects on hold==
*[[Southern Parkway]] &ndash;Project concept only. No plans to move forward
*[[Southern Parkway]] &ndash;Project concept only. No plans to move forward
*[[Berkmar Drive at Fashion Square Mall bridge]] &ndash; Called for in [[Places29 Master Plan]] but no plans to move forward
*[[Berkmar Drive at Fashion Square Mall bridge]] &ndash; Called for in [[Places29 Master Plan]] but no plans to move forward


==Defunct projects==
==Defunct projects==
*[[Eastern Connector]]: Project concept only. No plans to move forward
*[[Eastern Connector]]: Project concept only. No plans to move forward
*[[Western Bypass]]: Project terminated by Commonwealth Transportation Board in June 2014
*[[Western Bypass]]: Project terminated by Commonwealth Transportation Board in June 2014
Line 110: Line 133:


== See also ==
== See also ==
*[[Transportation Improvement Program]]
*[[Transportation Improvement Program]]
   
   
Line 117: Line 141:


==External links==
==External links==
*[http://action.cvilletomorrow.org/cvilleaction/Transportation_Matrix.html Charlottesville Tomorrow's Transportation Matrix]{{deadlink}}
*[http://action.cvilletomorrow.org/cvilleaction/Transportation_Matrix.html Charlottesville Tomorrow's Transportation Matrix]{{deadlink}}
*[http://www.albemarle.org/department.asp?department=planning&relpage=7968 Albemarle County's Transportation page]
*[http://www.albemarle.org/department.asp?department=planning&relpage=7968 Albemarle County's Transportation page]
*[http://albemarlehistory.org/hatton_ferry.htm Hatton Ferry]
*[http://albemarlehistory.org/hatton_ferry.htm Hatton Ferry]


[[Category: Transportation projects|*]]
[[Category:Transportation projects|*]]
[[Category:Lists|Transportation projects]]
[[Category:Lists|Transportation projects]]

Revision as of 15:50, 20 January 2021

Lists of transportation projects, real or imagined, in Charlottesville or Albemarle County.

Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

Proposed new roads

Road Improvements

Completed

Under construction


Planning stages

Corridor studies

In Design

Conceptual stage

Trails and train infrastructure

Completed

Planned

Transit Projects

Completed

Conceptual

Project matrix (under development)

Trails, sidewalks and greenway projects

Project Purpose Status Next milestone Sponsor
Tabor-Hilltop Pedestrian Improvements Connect pedestrians from Downtown Crozet to Claudius Crozet Park Pre-application for TA grant TA Grant deadline Albemarle County
Hydraulic Road Shared Use Path Continue 250 Bypass Shared Use Path to Hillsdale Drive Pre-application for TA grant TA Grant deadline Charlottesville
Moores Creek Greenway - Sunset Avenue to Old Lynchburg Road Construct shared use path from Sunset Avenue to Old Lynchburg Road with pedestrian crossing at Azalea Park Pre-application for Revenue Sharing Revenue Sharing Deadline Albemarle County
Ivy Road Sidewalks Sidewalks along Ivy Road from the existing sidewalk at the Charlottesville City

limits to Stillfried Lane with a potential future extension along the University of Virginia property to

the Route 29/250 Bypass interchange.

Proceeding to bid Albemarle County
Rio Road / Avon Street and Rt. 250 Rockfish Gap Pike Sidewalks See page for details Proceeding to bid Albemarle County
Berkmar Bicycle and Pedestrian Improvements This project will support pedestrian and bicyclist safety by constructing an approximately 1.1 mile-long shared-use Path from the Berkmar Drive/Rio Road West intersection to Hilton Heights Road and connect to the shared use path extending northward from the Berkmar Drive-Hilton Heights Road roundabout. Design 30 percent design Albemarle County

Projects on hold

Defunct projects

See also

Sources

[4]

  1. Web. UVA Foundation Breaks Ground on Lewis and Clark Extension, CJ Paschall, News Article, NBC29, September 26, 2019, retrieved September 29, 2019.
  2. Web. Capital Projects Status Report - 2nd Quarter CY2019, Status Report, Facilities & Environmental Services Department Facilities Planning & Construction Division, August 7, 2019, retrieved August 16, 2019.
  3. Web. Fifth Street corridor study reveals poor traffic conditions, Allison Wrabel, Daily Progress, Lee Enterprises, February 21, 2020, retrieved February 25, 2020. Print. February 22, 2020 page A1.
  4. Web. AN INDEX TO ROADS SHOWN IN THE ALBEMARLE COUNTY SURVEYORS BOOKS 1744-1853, Nathaniel Mason Pawlett, Faculty Research Historian, Virginia Highway & Transportation Research Council (A Cooperative Organization Sponsored Jointly by the Virginia Department of Highways & Transportation and the University of Virginia), March 1976, retrieved 10-22-08.

External links