Lickinghole Creek Bridge: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[image: 20080104-Eastern-Avenue.jpg|280 px|right]] | |||
== Project details == | == Project details == | ||
The proposed Lickinghole Creek Bridge is a structure that will carry the proposed [[Eastern Avenue (Crozet)|Eastern Avenue]] over the creek. The current cost estimate is $4 million. It is part of the [[Crozet Master Plan]]. | The proposed Lickinghole Creek Bridge is a structure that will carry the proposed [[Eastern Avenue (Crozet)|Eastern Avenue]] over the creek. The current cost estimate is $4 million. It is part of the [[Crozet Master Plan]]. | ||
The contact for the project is Juan Wade, Transportation Planner, Albemarle County. | |||
== Status == | == Status == | ||
Line 8: | Line 11: | ||
The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge. | The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge. | ||
== Google maps == | |||
== Next public meeting == | |||
== | == References == | ||
[[Category: Transportation Matrix]] | [[Category: Transportation Matrix]] |
Revision as of 14:27, 4 January 2008
Project details
The proposed Lickinghole Creek Bridge is a structure that will carry the proposed Eastern Avenue over the creek. The current cost estimate is $4 million. It is part of the Crozet Master Plan.
The contact for the project is Juan Wade, Transportation Planner, Albemarle County.
Status
The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge.