Georgetown Road: Difference between revisions
Jump to navigation
Jump to search
Jcglendening (talk | contribs) mNo edit summary |
Jcglendening (talk | contribs) (updates) |
||
Line 12: | Line 12: | ||
<!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | <!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | ||
| purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks). | | purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks). | ||
| status-desc =VDOT reported | | status-desc =As of June, 2009, VDOT reported the design has been approved and the Right of Way acquisition will begin in the Winter of 2009. <ref name="MPO">MPO Area Transportation Project Status Matrix. 16 June 2009.</ref>The project has been drastically scaled back from its original plan. In July 2007, VDOT's Utility Section will determine if utility relocation can be scaled back. Project may be pushed back further due to continued reductions in state and federal transportation revenues. Priority on [[County’s Secondary Six-Year Improvement Program]]. | ||
| website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website] | | website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website] | ||
| vdot-dashboard = | | vdot-dashboard = | ||
| contact =[[ | | contact =[[Tracy Elliott]], [[VDOT]] project manager | ||
}} | }} | ||
==Map== | ==Map== |
Revision as of 15:08, 28 July 2009
Georgetown Road | ||
---|---|---|
Planned
|
||
Project Overview
|
| |
Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
|
||
Cost | $3,018,300 | |
Sponsor | VDOT | |
Next meeting | March 24, 2009 Public Hearing at Albemarle High School | |
Status Update
|
| |
As of June, 2009, VDOT reported the design has been approved and the Right of Way acquisition will begin in the Winter of 2009. [1]The project has been drastically scaled back from its original plan. In July 2007, VDOT's Utility Section will determine if utility relocation can be scaled back. Project may be pushed back further due to continued reductions in state and federal transportation revenues. Priority on County’s Secondary Six-Year Improvement Program. |
||
Website | Project website | |
Contact | Tracy Elliott, VDOT project manager |
Map
External Links
Notes
- ↑ MPO Area Transportation Project Status Matrix. 16 June 2009.