Georgetown Road: Difference between revisions
Jump to navigation
Jump to search
Jcglendening (talk | contribs) mNo edit summary |
m (org) |
||
(7 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
'''Georgetown Road''' connects [[Barracks Road]] with [[Hydraulic Road]], north of [[U.S. 29]]. | |||
{{transport-stub}} | |||
==Improvements== | |||
{{Infobox Transportation | {{Infobox Transportation | ||
| name =Georgetown Road | | name =Georgetown Road | ||
| photo = | | photo = | ||
| caption = | | caption = | ||
| status ={{ | | status ={{complete}} | ||
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | <!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | ||
| meeting = | | meeting = N/A | ||
| location = | | location = | ||
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville --> | <!--ABOVE USE JURISDICTION: Albemarle, Charlottesville --> | ||
Line 12: | Line 16: | ||
<!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | <!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | ||
| purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks). | | purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks). | ||
| status-desc = | | status-desc = Ad date of Feb. 8, 2011. <ref name="kelsey-email" /> Priority on [[County’s Secondary Six-Year Improvement Program]]. | ||
| website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website] | | website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website] | ||
| vdot-dashboard = | | vdot-dashboard = | ||
| contact =[[ | | contact =Tracy Elliott, [[VDOT]] project manager | ||
}} | }} | ||
A plan to make road improvements and add multi-modal facilities was completed on November 8, 2011. <ref name="completion">{{cite web|title=VDOT Albemarle County Monthly Report, December 2011|url=http://www.albemarle.org/upload/images/Forms_Center/Departments/Board_of_Supervisors/Forms/Agenda/2011Files/1207/07.7_VDoTMonthlyReport.pdf|author=|work=|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=December 7, 2011}}</ref> | |||
An asphalt pedestrian pathway on the west side of the Road was replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. <ref name="VDOT">{{cite web|title=|url=http://www.virginiadot.org/projects/culpeper/georgetown_road.asp|author=|work=|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 24, 2011}}</ref> | |||
The road closed to through traffic several times during construction. VDOT had planned a completion date of September 23, 2011 but certified it as complete as of November 8, 2011. <ref name="VDOT" /> | |||
===Timeline=== | |||
*February 8, 2011: Project bid for construction. <ref name="kelsey-email">{{cite email|subject=ad date for Jarmans Gap?|from=Jack M. Kelsey, PE|sourceorg=Albemarle County|to=Sean Tubbs|repositoryorg=Charlottesville Tomorrow|senddate=January 27, 2011}}</ref> | |||
*November 8 2011: VDOT officially declares construction over <ref name="completion" /> | |||
{{clear}} | |||
==Map== | ==Map== | ||
{{ | {{map|lat=38.066507|lng=-78.503602|zoom=15}} | ||
== | ==References== | ||
<references/> | <references/> | ||
[[Category: | |||
[[Category:Secondary roads]] |
Latest revision as of 07:50, 21 April 2012
Georgetown Road connects Barracks Road with Hydraulic Road, north of U.S. 29.
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
Improvements
Georgetown Road | ||
---|---|---|
Completed
|
||
Project Overview
|
| |
Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
|
||
Cost | $3,018,300 | |
Sponsor | VDOT | |
Next meeting | N/A | |
Status Update
|
| |
Ad date of Feb. 8, 2011. [1] Priority on County’s Secondary Six-Year Improvement Program. |
||
Website | Project website | |
Contact | Tracy Elliott, VDOT project manager |
A plan to make road improvements and add multi-modal facilities was completed on November 8, 2011. [2]
An asphalt pedestrian pathway on the west side of the Road was replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. [3]
The road closed to through traffic several times during construction. VDOT had planned a completion date of September 23, 2011 but certified it as complete as of November 8, 2011. [3]
Timeline
- February 8, 2011: Project bid for construction. [1]
- November 8 2011: VDOT officially declares construction over [2]
Map
References
- ↑ 1.0 1.1 E-mail. Jack M. Kelsey, PE, Albemarle County. "ad date for Jarmans Gap?." Message to Sean Tubbs, Charlottesville Tomorrow. January 27, 2011.
- ↑ 2.0 2.1 Web. VDOT Albemarle County Monthly Report, December 2011, Virginia Department of Transportation, retrieved December 7, 2011.
- ↑ 3.0 3.1 Web. [1], Virginia Department of Transportation, retrieved August 24, 2011.