Georgetown Road: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
mNo edit summary
m (org)
 
(7 intermediate revisions by 4 users not shown)
Line 1: Line 1:
'''Georgetown Road''' connects [[Barracks Road]] with [[Hydraulic Road]], north of [[U.S. 29]].
{{transport-stub}}
==Improvements==
{{Infobox Transportation
{{Infobox Transportation
| name =Georgetown Road
| name =Georgetown Road
| photo =
| photo =
| caption =
| caption =
| status ={{planned}}
| status ={{complete}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting =March 24, 2009 Public Hearing at Albemarle High School
| meeting = N/A
| location =
| location =
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
Line 12: Line 16:
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
| purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
| purpose =Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
| status-desc =VDOT reported in November 2007 that right of way acquisition phase will begin in December 2008 with an estimated advertisement date of early 2011. The project has been drastically scaled back from its original plan. In July 2007, VDOT's Utility Section will determine if utility relocation can be scaled back. Project may be pushed back further due to continued reductions in state and federal transportation revenues. Priority on [[County’s Secondary Six-Year Improvement Program]].  
| status-desc = Ad date of Feb. 8, 2011. <ref name="kelsey-email" /> Priority on [[County’s Secondary Six-Year Improvement Program]].  
| website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website]
| website =[http://www.albemarle.org/department.asp?department=planning&relpage=8110 Project website]
| vdot-dashboard =
| vdot-dashboard =
| contact =[[Greg Krystyniak]], Project Manager, Location & Design Section, VDOT Culpeper District
| contact =Tracy Elliott, [[VDOT]] project manager
}}
}}
A plan to make road improvements and add multi-modal facilities was completed on November 8, 2011. <ref name="completion">{{cite web|title=VDOT Albemarle County Monthly Report, December 2011|url=http://www.albemarle.org/upload/images/Forms_Center/Departments/Board_of_Supervisors/Forms/Agenda/2011Files/1207/07.7_VDoTMonthlyReport.pdf|author=|work=|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=December 7, 2011}}</ref>
An asphalt pedestrian pathway on the west side of the Road was replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. <ref name="VDOT">{{cite web|title=|url=http://www.virginiadot.org/projects/culpeper/georgetown_road.asp|author=|work=|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 24, 2011}}</ref>
The road  closed to through traffic several times during construction. VDOT had planned a completion date of September 23, 2011 but certified it as complete as of November 8, 2011. <ref name="VDOT" />
===Timeline===
*February 8, 2011: Project bid for construction. <ref name="kelsey-email">{{cite email|subject=ad date for Jarmans Gap?|from=Jack M. Kelsey, PE|sourceorg=Albemarle County|to=Sean Tubbs|repositoryorg=Charlottesville Tomorrow|senddate=January 27, 2011}}</ref>
*November 8 2011: VDOT officially declares construction over <ref name="completion" />
{{clear}}
==Map==
==Map==
{{Map|lat=38.066507|lng=-78.503602|zoom=15}}
{{map|lat=38.066507|lng=-78.503602|zoom=15}}
==External Links==
 
==Notes==
==References==
<references/>
<references/>
[[Category: Transportation Matrix]]
 
[[Category:Secondary roads]]

Latest revision as of 07:50, 21 April 2012

Georgetown Road connects Barracks Road with Hydraulic Road, north of U.S. 29.

Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

Improvements


Georgetown Road

Completed

Project Overview

Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
Cost $3,018,300
Sponsor VDOT
Next meeting N/A

Status Update

Ad date of Feb. 8, 2011. [1] Priority on County’s Secondary Six-Year Improvement Program.

Website Project website
Contact Tracy Elliott, VDOT project manager

A plan to make road improvements and add multi-modal facilities was completed on November 8, 2011. [2]

An asphalt pedestrian pathway on the west side of the Road was replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. [3]

The road closed to through traffic several times during construction. VDOT had planned a completion date of September 23, 2011 but certified it as complete as of November 8, 2011. [3]

Timeline

  • February 8, 2011: Project bid for construction. [1]
  • November 8 2011: VDOT officially declares construction over [2]

Map

References

  1. 1.0 1.1 E-mail. Jack M. Kelsey, PE, Albemarle County. "ad date for Jarmans Gap?." Message to Sean Tubbs, Charlottesville Tomorrow. January 27, 2011.
  2. 2.0 2.1 Web. VDOT Albemarle County Monthly Report, December 2011, Virginia Department of Transportation, retrieved December 7, 2011.
  3. 3.0 3.1 Web. [1], Virginia Department of Transportation, retrieved August 24, 2011.