Fontaine Avenue Widening: Difference between revisions
No edit summary |
(updated - streetscape mention) |
||
Line 16: | Line 16: | ||
| vdot-dashboard = | | vdot-dashboard = | ||
| contact = | | contact = | ||
}} | |||
'''Fontaine Avenue Widening''' is the designation for a project to widen [[Fontaine Avenue]] to increase access to the University of Virginia's [[Fontaine Research Park]]. Originally proposed as a widening to three lanes, the most recent design, from September 2005, includes additional sidewalks and bike lanes and only calls for widening of the two-lane sections at two intersections. The project has been endorsed by the [[MPO Policy Board]] in the [[Transportation Improvement Program]]<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref>. However, the project is deferred until 2018{{fact}}. | '''Fontaine Avenue Widening''' is the designation for a project to widen [[Fontaine Avenue]] to increase access to the University of Virginia's [[Fontaine Research Park]]. Originally proposed as a widening to three lanes, the most recent design, from September 2005, includes additional sidewalks and bike lanes and only calls for widening of the two-lane sections at two intersections. The project has been endorsed by the [[MPO Policy Board]] in the [[Transportation Improvement Program]]<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref>. However, the project is deferred until 2018{{fact}}. | ||
The project may have been superceded by the [[Fontaine Avenue Streetscape]] project which made was recommended for inclusion in the FY2017 Six-Year Improvement Program. | |||
{{transport-stub}} | |||
==Council hearings== | ==Council hearings== | ||
In 2003, several people attended [[City Council]] meetings to protest the project<ref>{{minutes-citycouncil|id=195916|when=21 Apr. 2003}}</ref>. At Council's meeting on May 19, 2003, neighborhood resident Kevin Kotlarski presented a petition against the project with 399 signatures<ref>{{minutes-citycouncil|id=195919|when=19 May 2003}}</ref>. Through these actions, the project's scope was reduced. The item is scheduled to be advertised for construction in 2018{{fact}}. | In 2003, several people attended [[City Council]] meetings to protest the project<ref>{{minutes-citycouncil|id=195916|when=21 Apr. 2003}}</ref>. At Council's meeting on May 19, 2003, neighborhood resident Kevin Kotlarski presented a petition against the project with 399 signatures<ref>{{minutes-citycouncil|id=195919|when=19 May 2003}}</ref>. Through these actions, the project's scope was reduced. The item is scheduled to be advertised for construction in 2018{{fact}}. | ||
== | ==Reference== | ||
{{reflist}} | |||
[[Category: Transportation Improvement Program (TIP) items]] | [[Category: Transportation Improvement Program (TIP) items]] |
Latest revision as of 17:17, 16 February 2016
Fontaine Avenue Widening | ||
---|---|---|
Proposed
|
||
Project Overview
|
| |
increase access to Fontaine Research Park
|
||
Location | Charlottesville | |
Status Update
|
| |
deferred indefinitely |
Fontaine Avenue Widening is the designation for a project to widen Fontaine Avenue to increase access to the University of Virginia's Fontaine Research Park. Originally proposed as a widening to three lanes, the most recent design, from September 2005, includes additional sidewalks and bike lanes and only calls for widening of the two-lane sections at two intersections. The project has been endorsed by the MPO Policy Board in the Transportation Improvement Program[1]. However, the project is deferred until 2018[citation needed].
The project may have been superceded by the Fontaine Avenue Streetscape project which made was recommended for inclusion in the FY2017 Six-Year Improvement Program.
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
Council hearings
In 2003, several people attended City Council meetings to protest the project[2]. At Council's meeting on May 19, 2003, neighborhood resident Kevin Kotlarski presented a petition against the project with 399 signatures[3]. Through these actions, the project's scope was reduced. The item is scheduled to be advertised for construction in 2018[citation needed].
Reference
- ↑ FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. Charlottesville-Albemarle Metropolitan Planning Organization. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf>
- ↑ Web. Charlottesville City Council meeting minutes, .pdf, Council Chambers, City of Charlottesville, 21 Apr. 2003.
- ↑ Web. Charlottesville City Council meeting minutes, .pdf, Council Chambers, City of Charlottesville, 19 May 2003.