Eastern Connector Study Steering Committee: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
m (cat, missing ref section, fixing non-specific URL)
m (wrong cat)
Line 17: Line 17:
<references/>
<references/>


[[Category:Planning studies]]
[[Category:Transportation studies]]

Revision as of 14:23, 14 July 2009


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector.

Purpose

The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.[1].

Members

References