(New page: Project Details: The Eastern Avenue Underpass is a project to create a grade-separated crossing of the CSX railway. The current cost estimate is $1,000,000. It...) |
No edit summary |
||
Line 1: | Line 1: | ||
Project Details | [[image: 20080104-Eastern-Avenue.jpg|280 px|right]] | ||
== Project Details == | |||
The [[Eastern Avenue (Crozet)|Eastern Avenue]] Underpass is a project to create a grade-separated crossing of the CSX railway. The current cost estimate is $1,000,000. It requires the Lickinghole Bridge. The project is part of the [[Crozet Master Plan]]. | The [[Eastern Avenue (Crozet)|Eastern Avenue]] Underpass is a project to create a grade-separated crossing of the CSX railway. The current cost estimate is $1,000,000. It requires the Lickinghole Bridge. The project is part of the [[Crozet Master Plan]]. | ||
The contact for this project is Juan Wade, Transportation Planner, Albemarle County. | |||
== Status == | == Status == | ||
Line 8: | Line 11: | ||
This project is currently not a priority on the [[County’s Secondary Six-Year Improvement Program]]. As such, there is currently no public meeting. | This project is currently not a priority on the [[County’s Secondary Six-Year Improvement Program]]. As such, there is currently no public meeting. | ||
== | == Google Map == | ||
== Next public meeting == | |||
== External links == | |||
== References == | |||
[[Category: Transportation Matrix]] | [[Category: Transportation Matrix]] | ||
[[Category: Road projects]] |
Revision as of 14:34, 4 January 2008
Project Details
The Eastern Avenue Underpass is a project to create a grade-separated crossing of the CSX railway. The current cost estimate is $1,000,000. It requires the Lickinghole Bridge. The project is part of the Crozet Master Plan.
The contact for this project is Juan Wade, Transportation Planner, Albemarle County.
Status
This project is currently not a priority on the County’s Secondary Six-Year Improvement Program. As such, there is currently no public meeting.