Coal Tower / Meade Avenue Trail: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(Added source)
(update partial)
Line 3: Line 3:
| photo =  
| photo =  
| caption =
| caption =
| status ={{proposed}}
| status ={{underway}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting =
| meeting =
Line 18: Line 18:
}}{{transport-stub}}
}}{{transport-stub}}


The [[Coal Tower / Meade Avenue Trail]] is a proposed trail that will connect the [[Downtown Transit Center]] to [[Meade Park]]. There, it will connect to new sidewalk running along Chesapeake Street as far as [[Riverview Park]].<ref>{{cite email|subject=Meade Avenue Trail plan|from=Chris Gensic|sourceorg=Charlottesville Parks and Trails|to=Claudia Elzey|repositoryorg=|senddate=27 June 2013}}</ref>
The [[Coal Tower / Meade Avenue Trail]] is a partially trail that connects the [[Downtown Transit Center]] to [[Meade Park]]. There is intended to connect to a new sidewalk running along Chesapeake Street as far as [[Riverview Park]]. {{fact}}
The trail will be built in three phases. The section between [[Beer Run]] and 10th Street will be built in conjunction with the [[City Walk]] development and paid for by City Walk owner Coran Capshaw of [[Red Light Management]].  
 
The trail was built in several phases. The section between [[Beer Run]] and 10th Street will be built in conjunction with the [[City Walk]] development and paid for by City Walk owner Coran Capshaw of [[Red Light Management]].  
A stretch from 10th Street to the [[Belmont Bridge]] could be built in 2013, according to the city's June 2013 Construction Report.<ref>{{cite web|title=June Construction Report: Parks & Trails|url=http://www.charlottesville.org/index.aspx?page=35|author=|work=|publisher=City of Charlottesville|location=|publishdate=June 2013|accessdate=28 June 2013}}</ref>
A stretch from 10th Street to the [[Belmont Bridge]] could be built in 2013, according to the city's June 2013 Construction Report.<ref>{{cite web|title=June Construction Report: Parks & Trails|url=http://www.charlottesville.org/index.aspx?page=35|author=|work=|publisher=City of Charlottesville|location=|publishdate=June 2013|accessdate=28 June 2013}}</ref>
The third leg, running along the east side of Meade Avenue between [[Beer Run]] and Meade Park, is scheduled to be built by December 2013.<ref>{{cite web|title=Meade Avenue Trail|url=http://www.charlottesville.org/Index.aspx?page=3450|author=|work=|publisher=City of Charlottesville|location=|publishdate=|accessdate=27 June 2013}}</ref>. Funding for it will come from a $300,000 Transportation Enhancement (TEA) grant from [[VDOT|Virginia Department of Transportation]].  
 
The third leg, running along the east side of Meade Avenue between [[Beer Run]] and Meade Park, was scheduled to be built by December 2013 but the status is unclear. <ref>{{cite web|title=Meade Avenue Trail|url=http://www.charlottesville.org/Index.aspx?page=3450|author=|work=|publisher=City of Charlottesville|location=|publishdate=|accessdate=27 June 2013}}</ref>. Funding for this section had been intended to come from a $300,000 Transportation Enhancement (TEA) grant from [[VDOT|Virginia Department of Transportation]].  
 
==History==
The Coal Tower / Meade Avenue Trail was listed as an item on the MPO's 2009 [[Transportation Improvement Program]].<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref> At that time, completion of the trail was planned for the summer of 2009.
The Coal Tower / Meade Avenue Trail was listed as an item on the MPO's 2009 [[Transportation Improvement Program]].<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref> At that time, completion of the trail was planned for the summer of 2009.


==References==
==References==

Revision as of 14:30, 26 September 2020



Coal Tower / Meade Avenue Trail

Project Underway

Project Overview

Establish multi-modal trail as parallel alternative to Route 29
Location Charlottesville
Sponsor Charlottesville

Status Update

In final design stages


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

The Coal Tower / Meade Avenue Trail is a partially trail that connects the Downtown Transit Center to Meade Park. There is intended to connect to a new sidewalk running along Chesapeake Street as far as Riverview Park. [citation needed]

The trail was built in several phases. The section between Beer Run and 10th Street will be built in conjunction with the City Walk development and paid for by City Walk owner Coran Capshaw of Red Light Management. A stretch from 10th Street to the Belmont Bridge could be built in 2013, according to the city's June 2013 Construction Report.[1]

The third leg, running along the east side of Meade Avenue between Beer Run and Meade Park, was scheduled to be built by December 2013 but the status is unclear. [2]. Funding for this section had been intended to come from a $300,000 Transportation Enhancement (TEA) grant from Virginia Department of Transportation.

History

The Coal Tower / Meade Avenue Trail was listed as an item on the MPO's 2009 Transportation Improvement Program.[3] At that time, completion of the trail was planned for the summer of 2009.

References

  1. Web. June Construction Report: Parks & Trails, City of Charlottesville, June 2013, retrieved 28 June 2013.
  2. Web. Meade Avenue Trail, City of Charlottesville, retrieved 27 June 2013.
  3. FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. Charlottesville-Albemarle Metropolitan Planning Organization. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf>