Bicycle and Pedestrian Master Plan: Difference between revisions
(+toole) |
(+more stuff) |
||
Line 1: | Line 1: | ||
The [[Charlottesville]] '''Bicycle and Pedestrian Master Plan''' is a document that describes in detail plans for multimodal infrastructure within the city of Charlottesville. Charlottesville [[City Council]] adopted the plan on [[September 8]], [[2015]]. <ref>{{cite web|title=Charlottesville City Council Minutes for September 8, 2015|url=https://www.charlottesville.org/home/showdocument?id=34187|author=|work=Council Minutes|publisher=City of Charlottesville|location=|publishdate=|accessdate=October 20, 2019}}</ref> The [[Toole Design Group]] was paid to develop the plan. {{fact}} | The [[Charlottesville]] '''Bicycle and Pedestrian Master Plan''' is a document that describes in detail plans for multimodal infrastructure within the city of Charlottesville. | ||
Charlottesville [[City Council]] most recently adopted the plan on [[September 8]], [[2015]]. <ref>{{cite web|title=Charlottesville City Council Minutes for September 8, 2015|url=https://www.charlottesville.org/home/showdocument?id=34187|author=|work=Council Minutes|publisher=City of Charlottesville|location=|publishdate=|accessdate=October 20, 2019}}</ref> The [[Toole Design Group]] was paid to develop the plan. {{fact}} The plan built off of a complete streets resolution adopted by Council the year before. | |||
The 2015 plan is an update of one adopted by Council in 2003. {{fact}} | |||
{{stub}} | {{stub}} | ||
==2015 update== | |||
"The 2015 Bicycle and Pedestrian Master Plan Update aims to fill in the gaps left by the 2003 Plan and provide the City of Charlottesville | |||
with a series of implementable actions that will result in complete walking and bicycling networks," reads the introduction of the plan. | |||
==References== | ==References== |
Revision as of 13:50, 20 October 2019
The Charlottesville Bicycle and Pedestrian Master Plan is a document that describes in detail plans for multimodal infrastructure within the city of Charlottesville.
Charlottesville City Council most recently adopted the plan on September 8, 2015. [1] The Toole Design Group was paid to develop the plan. [citation needed] The plan built off of a complete streets resolution adopted by Council the year before.
The 2015 plan is an update of one adopted by Council in 2003. [citation needed]
This article is a stub. You can help cvillepedia by expanding it. |
2015 update
"The 2015 Bicycle and Pedestrian Master Plan Update aims to fill in the gaps left by the 2003 Plan and provide the City of Charlottesville with a series of implementable actions that will result in complete walking and bicycling networks," reads the introduction of the plan.
References
- ↑ Web. Charlottesville City Council Minutes for September 8, 2015, Council Minutes, City of Charlottesville, retrieved October 20, 2019.