29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(updated)
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox Transportation
{{Infobox Transportation
| name =29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center
| name = 29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center
| photo =
| photo =29-widening-picture.jpg
| caption =
| caption =
| status ={{planned}}
| status ={{complete}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting = TBA
| meeting =
| location = Albemarle
| location =
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
| cost = $32.5 million <ref name="mpo-feb12">{{cite web|title=Design work on U.S. 29 widening to start this summer|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2012/02/vdot-updates.html|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=February 26, 2012|accessdate=February 28, 2012}}</ref>
| cost = $51 million <ref name="rfq">{{cite web|title=VDOT sets aggressive deadlines for Route 29 projects|url=http://www.cvilletomorrow.org/news/article/18631-route29-project-schedule/|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=July 25, 2014|accessdate=July 27, 2014}}</ref>
| sponsor =Virginia Department of Transportation
| sponsor = [[Virginia Department of Transportation]]
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
| purpose = Widen the so-called "hourglass" from 4 to 6 lanes
| purpose = Route 29 corridor improvements
| website =
| status-desc = preliminary engineering
| vdot-dashboard =
| website = http://route29solutions.org/learn_more/3._route_29_widening_page.asp
| contact =[[Lou Hatter]], VDOT Public Relations, Culpeper District
| vdot-dashboard ={{vdot-dashboard|77383}}
| contact =
}}
}}


The Virginia Department of Transportation is planning on a $33.5 project to widen U.S. 29 from Polo Grounds Road to [[Hollymead Town Center]] to six lanes. <ref name="mpo-feb12" /> The project was approved by the Commonwealth Transportation Board in July 2012 at the same meeting in which $197.4 million in additional funds were allocated to the [[Western Bypass]] of U.S. 29. Construction is tentatively scheduled for 2015.  
The Virginia Department of Transportation helped oversee a $51 million project to widen U.S. 29 from Polo Grounds Road to [[Hollymead Town Center]] to six lanes. <ref name="rfq" /> <ref name="mpo-feb12">{{cite web|title=Design work on U.S. 29 widening to start this summer|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2012/02/vdot-updates.html|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=February 26, 2012|accessdate=February 28, 2012}}</ref> A design-build contract was awarded to the [[Lane / Corman Joint Venture]] in February 2015.   The project is one of the [[Route 29 Solutions]] and a notice to proceed was granted in March 2015. <ref>{{cite web|title=Charlottesville- Albemarle Metropolitan Planning Organization (MPO) Area Transportation Projects
Project Status Matrix
|url=http://www.tjpdc.org//agendas_and_minutes/mpoPoli/age_mpoPoli_15_03_25.asp|author=|work=|publisher=Thomas Jefferson Planning District Commission|location=|publishdate=|accessdate=March 25, 2015}}</ref> It is the subject of a lawsuit.


{{stub}}
{{transport-stub}}


==Background==
The project was originally approved by the Commonwealth Transportation Board in July 2012 at the same meeting in which $197.4 million in additional funds were allocated to the [[Western Bypass]] of U.S. 29. The CTB added additional money to the project in June 2014 when the bypass was defunded. <ref>{{cite web|title=Western Bypass funding eliminated; CTB supports other U.S. 29 projects|url=http://www.cvilletomorrow.org/news/article/18369-bypass-funding-eliminated/|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=June 18, 2014|accessdate=July 27, 2014}}</ref>
The project became part of the design build contract for three projects recommended by [[Philip Shucet]] as part of the [[Route 29 Advisory Panel]] and overseen by the [[Route 29 Project Delivery Advisory Panel]].
This project had been called for in the [[Places29 Master Plan]].


==References==
==References==
{{reflist}}
{{reflist}}
[[Category: Transportation Improvement Program (TIP) items]]
[[Category:U.S. Route 29|Corridor improvements]]

Latest revision as of 14:46, 9 October 2017


29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center
29-widening-picture.jpg

Completed

Project Overview

Route 29 corridor improvements
Cost $51 million [1]
Sponsor Virginia Department of Transportation

Status Update

preliminary engineering

Website http://route29solutions.org/learn_more/3._route_29_widening_page.asp
VDOT Dashboard [1]

The Virginia Department of Transportation helped oversee a $51 million project to widen U.S. 29 from Polo Grounds Road to Hollymead Town Center to six lanes. [1] [2] A design-build contract was awarded to the Lane / Corman Joint Venture in February 2015. The project is one of the Route 29 Solutions and a notice to proceed was granted in March 2015. [3] It is the subject of a lawsuit.


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

Background

The project was originally approved by the Commonwealth Transportation Board in July 2012 at the same meeting in which $197.4 million in additional funds were allocated to the Western Bypass of U.S. 29. The CTB added additional money to the project in June 2014 when the bypass was defunded. [4]

The project became part of the design build contract for three projects recommended by Philip Shucet as part of the Route 29 Advisory Panel and overseen by the Route 29 Project Delivery Advisory Panel.

This project had been called for in the Places29 Master Plan.

References

  1. 1.0 1.1 Web. VDOT sets aggressive deadlines for Route 29 projects, Sean Tubbs, Charlottesville Tomorrow, July 25, 2014, retrieved July 27, 2014.
  2. Web. Design work on U.S. 29 widening to start this summer, Sean Tubbs, Charlottesville Tomorrow, February 26, 2012, retrieved February 28, 2012.
  3. Web. [http://www.tjpdc.org//agendas_and_minutes/mpoPoli/age_mpoPoli_15_03_25.asp Charlottesville- Albemarle Metropolitan Planning Organization (MPO) Area Transportation Projects Project Status Matrix], Thomas Jefferson Planning District Commission, retrieved March 25, 2015.
  4. Web. Western Bypass funding eliminated; CTB supports other U.S. 29 projects, Sean Tubbs, Charlottesville Tomorrow, June 18, 2014, retrieved July 27, 2014.