29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(Redirected page to Route 29 Corridor Improvements)
Line 1: Line 1:
{{Infobox Transportation
#REDIRECT [[Route 29 Corridor Improvements]]
| name =29 North Widening-Widening between Polo Grounds Road and Hollymead Town Center
| photo =
| caption =
| status ={{planned}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting = TBA
| location = Albemarle
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
| cost = $32.5 million <ref name="mpo-feb12">{{cite web|title=Design work on U.S. 29 widening to start this summer|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2012/02/vdot-updates.html|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=February 26, 2012|accessdate=February 28, 2012}}</ref>
| sponsor =Virginia Department of Transportation
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
| purpose = Widen the so-called "hourglass" from 4 to 6 lanes
| website =
| vdot-dashboard =
| contact =[[Lou Hatter]], VDOT Public Relations, Culpeper District
}}
 
The Virginia Department of Transportation is planning on a $33.5 project to widen U.S. 29 from Polo Grounds Road to [[Hollymead Town Center]] to six lanes. <ref name="mpo-feb12" /> The project was approved by the Commonwealth Transportation Board in July 2012 at the same meeting in which $197.4 million in additional funds were allocated to the [[Western Bypass]] of U.S. 29. Construction is tentatively scheduled for 2015.
 
{{stub}}
 
 
==References==
{{reflist}}
 
[[Category:U.S. Route 29]]

Revision as of 12:50, 19 November 2013