File:19970723-29Bypass-Preliminary-Engineering-Plans.pdf
Jump to navigation
Jump to search
19970723-29Bypass-Preliminary-Engineering-Plans.pdf (file size: 33.82 MB, MIME type: application/pdf)
VDOT's preliminary engineering plans for the U.S. Route 29 Western Bypass
July 23, 1997 plans (with sheet revision dates between September 9, 1997 and February 14, 2001)
Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 15:13, 6 July 2011 | (33.82 MB) | 1099047208 (talk | contribs) | VDOT's preliminary engineering plans for the U.S. Route 29 Western Bypass July 23, 1997 plans (with sheet revision dates between September 9, 1997 and February 14, 2001) Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA re |
You cannot overwrite this file.
File usage
There are no pages that use this file.